Home  /  Temporary refrigeration facilities

PROJECT COLD STORAGE

Temporary refrigeration facilities.

Keep the work moving around you.

Plan temporary cold-storage capacity around a renovation, equipment replacement, expansion, or unexpected shutdown. Coordinate the equipment, site access, and operating workflow before the changeover begins.

Share your location, dates, and project requirements.

RENOVATIONS / CHANGEOVERS / CONTINGENCIES

Think beyond the unit. Plan the operation.

Planned project support

Temporary capacity inquiries

Site-led equipment selection

THE OPTIONS

Three reasons to plan ahead.

Use the project objective to guide equipment selection and the timing of your temporary setup.

PLANNED SHUTDOWNS

Renovations & replacements

Discuss storage needs before taking existing refrigeration out of service. Align the rental with the construction or replacement schedule.

  • Share the planned shutdown and restart dates
  • Allow time for equipment and site review

EXTRA CAPACITY

Expansion & seasonal demand

Explore a temporary solution when inventory or production plans call for additional storage outside your normal footprint.

  • Estimate the product volume and daily access
  • Review space and utility arrangements

UNEXPECTED DISRUPTION

Equipment outages

Start an emergency inquiry with the location and the storage conditions your products require. Availability and delivery need confirmation.

  • Identify the product requirements clearly
  • Keep a site contact ready to coordinate access

Original site image. Equipment configurations and project scope must be confirmed.

DESIGN THE CHANGEOVER

Storage, access, and workflow belong in one plan.

A temporary facility is more than a space allocation. Consider how products reach it, who will access it, where delivery vehicles can move, and how the rental fits around ongoing work at the main building.

Bring your site layout or photos to the conversation. Compare refrigerated trailers with container configurations, and ask whether a ramp, landing, or project-specific permit support needs to be discussed separately. Confirm the services included in your written rental scope rather than assuming a complete turnkey project.

  • Map the route between the building, loading point, and temporary storage.
  • Confirm the storage conditions, utility needs, and daily access arrangements.
  • Identify local review, installation, or inspection responsibilities before operation.

Planning a refrigeration shutdown?

Discuss the temporary setup while your project schedule is still being developed. Share the proposed start, duration, and site constraints.

HOW IT WORKS

Build the plan before the changeover.

01

Scope the operation

Identify the products, capacity, access needs, and expected length of the temporary arrangement.

02

Coordinate the site

Review equipment placement, delivery, utility connections, and any applicable site approvals.

03

Agree on the sequence

Confirm preparation, delivery, handover, operating responsibilities, and eventual pickup.

GOOD QUESTIONS

Before you book.

Use these answers to prepare for a project-specific conversation with the rental team.

What equipment can form a temporary refrigeration setup?

The site lists refrigerated trailers and refrigerated containers. The suitable combination depends on the storage needs, space, utilities, access, and equipment availability.

Does a rental automatically include installation and permits?

Do not assume that. Ask for the written scope to identify delivery, positioning, connections, access equipment, documentation, and any permit-support services separately.

Can temporary storage remain during a longer renovation?

Discuss the expected project duration and extension options. The final term and availability need to be agreed with the rental team.

How early should we discuss a planned changeover?

Start once the location, approximate dates, and storage needs are known. A specific lead time cannot be promised without reviewing the equipment and project requirements.

LET’S TALK ABOUT THE PROJECT

Keep your temporary setup connected to the bigger plan.

Talk through the storage needs, site layout, and project timeline before choosing the equipment.

Refrigeration Trailers for Lease. Equipment, delivery, and project scope are subject to confirmation.